top of page

CARE HOME, GRAVESEND

The Rotunda project at a care home in Gravesend shows how mcuh you can do with the StaBlock. It includes planters, straight sections, curved sections, seats, steps, inserts for balustrades, perpendicular abutting walls and more.

The walls were installed in two phases to fit with the groundwork contractors preferred sequencing and to accommodate design alterations midway through construction. ​

 

Colin Gaunt, Concrete & Rock Solutions

Capture.JPG

330m   StaBlock wall area

2

28m   daily install rate

2

 3 man team

12 days total install time

bottom of page