top of page

CARE HOME, GRAVESEND

The Rotunda project at a care home in Gravesend shows how mcuh you can do with the StaBlock. It includes planters, straight sections, curved sections, seats, steps, inserts for balustrades, perpendicular abutting walls and more.

​

The walls were installed in two phases to fit with the groundwork contractors preferred sequencing and to accommodate design alterations midway through construction. ​

 

Colin Gaunt, Concrete & Rock Solutions

Capture.JPG

330m   StaBlock wall area

2

28m   daily install rate

2

 3 man team

12 days total install time

© 2020 by Concrete & Rock Solutions Ltd

  • Instagram
  • Twitter
  • YouTube
  • Pinterest
  • Facebook
  • Linkedin
bottom of page